Daytime Noise Monitoring Results -- Noraml weekday          
                         
Station M5, Chuk Lam Ming Tong                  
Date Start Time End Time  Weather Noise level (dB(A)), 30 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
04-Jun-10 13:42 14:12 Cloudy 68 70 67 Some loading activities Operation of mobile crane by other contractor in The John F. Kennedy Centre Annex where near the Chuk Lam Ming Tong and road traffic noise N.A 24.7 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
09-Jun-10 14:11 14:41 Cloudy 67 69 61 Some loading activities Minor road side construction work
 adjcent the Sandy PTW 
N.A 25.6 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
15-Jun-10 14:09 14:39 Cloudy 66 68 62 N.A Road traffic noise. N.A 29.3 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
21-Jun-10 09:54 10:24 Cloudy 62 64 58 Some loading activities Road traffic noise. N.A 29.6 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
28-Jun-10 09:52 10:22 Cloudy 65 67 61 Some loading activities Road traffic noise and minor road side construction near the Sandy Bay PTW N.A 25.5 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
      Min. 62                
      Max. 68